Project controls
Schedule monitoring, progress and resource comparisons.
The wider Prensia direction: dependable site evidence, the engineer's routine work and, later, a company view. The live foundation is Site Reporter; specialist engineering workflows are under development.
34 engineering skills in the proposed catalogue, not 34 live capabilities. Most specialist workflows are planned. Human judgement and sign-off remain with the engineer.
Schedule monitoring, progress and resource comparisons.
RFI and submittal logs, approval follow-up and drawing revision checks.
Actions, commitments and missing updates, organised for the engineer.
Inspection tracking, NCR follow-up and material shortage warnings.
Prensia drafts the record. The engineer checks it, takes responsibility for it and decides when to sign.
Arabic and English text, plus photos with captions, from the WhatsApp group the field already uses. No new app for the field.
One daily progress report in a fixed A–L format, scheduled for about 07:15 Saudi time. This is a scheduled target, not an on-time guarantee.
The draft is built to trace its numbers to source messages. Captioned photos support the record; photo analysis is not included in reports today.
The engineer reviews, edits and signs the draft. The signed version is locked. Only signed versions are emailed to opted-in recipients.
Manpower · Equipment · Works by area · Concrete pours · Materials · Inspections and RFIs · Safety and QC · Factual delays · Look-ahead · Insights · Open issues and actions
Tables and evidence are checked during review before signing.
No clients yet. Three demo projects run on real site groups. A controlled customer evaluation is being proposed.
Reads Arabic and English text plus captioned photos from an existing site WhatsApp group, then drafts one fixed-format daily progress report for human review and signature.
Built with an open-source tool for Arabic and English and tested on early site voice notes; now being connected to the daily report.
The broader engineering direction: controls, documents, site follow-ups, quality and materials. Gated future scope built on signed daily records; most specialist skills are planned.
Future cross-project scope with no roadmap date.
LIVE: running today on real site groups. PARTLY: built and tested in part. NEXT: future scope.